last_updated: 2025-07-15
tags: [pain-points, bottlenecks, qa-process, yara724]
source: import-knowledge
---
# Pain Points — Yara724 QA Workflow
## Time Breakdown (estimated)
| Activity | % of Day |
|---|---|
| Bug investigation (diagnosis) | 40% |
| API investigation / test setup | 25% |
| Creating Jira tickets | 15% |
| Context switching (tool switching) | 10% |
| Taking requirements | 5% |
| Other | 5% |
- [ ] Validate time percentages with actual measurement
## 1. API Investigation (25%)
The biggest time consumer. Reasons:
- 1020 API calls to prepare a test case from scratch
- Cases cannot be reused due to backend constraints — must create fresh each time
- Large number of APIs; difficulty remembering rarely used APIs
- Finding the correct endpoint
- Understanding API sequences within a business flow
- Preparing request bodies
- Switching between multiple tools
## 2. Authentication Overhead
Many test sessions require repeating the authentication process. Typical sequence:
```
Open Swagger
Captcha API
Login API
Receive Token
Authorize
Start Testing
```
Repeated ~10 times/day, ~2 minutes each = ~20 min/day pure waste.
## 3. Bug Diagnosis (40%)
Most time-consuming activity. Root cause analysis done via:
- Visual inspection (comparing UI behavior with expected behavior)
- Swagger doc comparison (sometimes)
- Reading frontend/backend code (for some bugs)
## 4. Context Switching (10%)
Knowledge is fragmented across multiple systems:
- Jira
- Swagger
- DevTools
- MongoDB
- Bruno
- Backend code
- Frontend code
- Product knowledge
A single investigation often requires moving repeatedly between these tools.
## 5. Documentation Overhead (15%)
Jira ticket creation takes ~15 min each. Bottleneck is analysis/thinking, not formatting.
## 6. Weak Jira ↔ Code Traceability
- Commit messages rarely reference Jira ticket IDs
- Folders are disorganized
## 7. Stateful Business Flows
The application is heavily state-driven. Many APIs cannot be tested independently because business entities must first reach a specific state:
```
Create Case
Upload Documents
Expert Review
Approval
Payment
```
This creates dependencies between APIs and significantly increases investigation time.
## 8. Test Data Preparation
MongoDB is frequently used to:
- Inspect business entities
- Verify system state
- Modify test data when necessary
## 9. Technical Learning Curve
Background is Mechanical Engineering, not CS. Often uses development tools without fully understanding their best practices:
- Swagger, MongoDB, Postman, Bruno, Browser DevTools, JMeter
Knows how to accomplish tasks, but not always the most efficient or standard way.
## 10. Requirement Quality
Some Jira tickets are created by the CTO using AI. Since the CTO is relatively new to the product, some generated titles and descriptions lack sufficient product context:
- Requirements can become ambiguous
- Reading and understanding them takes extra effort
- Additional clarification is often required before implementation
## Primary Bottlenecks (Summary)
The main bottlenecks are NOT writing Jira tickets. Instead:
1. Reconstructing business context
2. Finding the correct APIs
3. Navigating complex API chains
4. Preparing valid test data
5. Repeating authentication and setup tasks
6. Frequent context switching across tools